PERMITS · 636975-98 · DISTRICT 10

Drill: Red Bluff "16" #4A

Expired

T-N-T Engineering, Inc.  ·  Reeves County  · Vertical  · Final completion

Apr 17, 2007
issued
3,500
permitted depth, ft
42-389-32462
API number
2
versions on file

FIRST SEEN BY PETRORA APR 17, 2007 · WHY THIS DIFFERS FROM THE ISSUE DATE

Lifecycle

  1. Apr 17, 2007Issued · Permit approved
  2. Apr 25, 2007Spud · Drilling began
  3. Apr 26, 2007Surface casing · Surface string set
  4. May 2, 2007Received · Application received by the RRC
  5. May 3, 2007Well status · Final completion
  6. May 31, 2007Amended · Changed after issuance
  7. Apr 17, 2009Expired · Not drilled within the permit term

A drilling permit is valid for two years from issuance unless extended. How permits work →

Surface location

Acres
360
Nearest town
10.4 mi NW of Orla
Nearest lease line
975 ft

No coordinates yet. The RRC's GIS record usually lands within days of issuance; permits from the historical master file never carry one.

Versions

The RRC numbers versions down from 99: 99 is the original filing, 98 the first amendment. Current version first.

SeqTypeOperatorReceivedIssuedAmendedDepthSeen
98DrillT-N-T Engineering, Inc.May 2, 2007Apr 17, 2007May 31, 20073,500Apr 17, 2007
99DrillT-N-T Engineering, Inc.Apr 12, 2007Apr 17, 2007—3,500Apr 17, 2007

Application records

Status entries the RRC filed against this permit number.

Status no.ReceivedStatusOperatorLease / well
636975-98May 2, 2007AT-N-T Engineering, Inc.Red Bluff "16" #4A
636975-99Apr 12, 2007AT-N-T Engineering, Inc.Red Bluff "TXL 16" #4A

About this data

W-1 drilling permit from the RRC OGA049M master and daily daf420 files, refreshed every business day. Surface coordinates come from the daily file only. Amendments appear as sequence numbers on the same permit; the lowest is current.

Developers: this page as JSON is GET /v1/data/permits/tx/636975, documented in the API reference.