Produced water and disposal in Oldham County
Every injection and disposal permit in the county, what each well is permitted to take, what its operator reported, and who is reporting daily. Earthquakes in the area →
Oldham County has 13 active injection and disposal wells, 7 of them permitted for disposal, with 57,500 barrels a day of permitted capacity.
Operators reported 2.5 million barrels injected on H-10 filings in the twelve months to June 2025, up 11% on the year before, about 12% of what the permits allow.
LDX Oper Co, LLC is the largest injector in the county, with 1.1 million barrels reported across 2 active wells.
- 13
- active injection wells, 7 for disposal
- 57.5K
- bbl/d permitted capacity
- 2.54M
- bbl reported, H-10 year to Jun 2025 +11%
- 12%
- of permitted capacity used
- 43
- UIC permits on file, all time
Reported injection, by month
H-10 FILINGS · TEN YEARS TO JUN 2025
Last 12 months 2,535,130 · prior 12 2,286,831(+11%)
Who injects here
Operators with active permits in the county, by reported H-10 volume over the settled year.
| Operator | Reported, bbl | Active wells | Capacity bbl/d |
|---|---|---|---|
| LDX Oper Co, LLC | 1.07M | 2 | 12K |
| Arrow Oil & Gas, LLC | 638K | 3 | 8K |
| Presidio Petro LLC | 615K | 3 | 13K |
| Stephens & Johnson Oper Co | 153K | 3 | 4.5K |
| Neas Oper, LLC | 62.9K | 1 | 10K |
| Edh Disposals LLC | — | 1 | 10K |
Injection permits
43 UIC PERMITS · 13 ACTIVE · PAGE 1 OF 1
Active permits first, by reported volume, then cancelled, plugged, and never-activated permits.
| Well | Operator | Status | Purpose | Reported, bbl | bbl/d permitted | Zone, ft | Permitted |
|---|---|---|---|---|---|---|---|
| Alamosa -315- #8 | LDX Oper Co, LLC | Active | Disposal | 1.07M | 6,000 | 4,075–4,706 | Sep 13, 2007 |
| Bivins-Lit #301A | Presidio Petro LLC | Active | Disposal | 615K | 5,000 | 4,568–4,930 | Jan 18, 2013 |
| MD 18 #1 | Arrow Oil & Gas, LLC | Active | Enhanced recovery | 457K | 4,000 | 6,210–6,357 | Sep 24, 2008 |
| Aog Parker Creek #4 | Arrow Oil & Gas, LLC | Active | Enhanced recovery | 181K | 2,000 | 7,052–7,330 | Aug 26, 2015 |
| Fulton-King "A" #4 | Stephens & Johnson Oper Co | Active | Disposal | 94.1K | 2,000 | 4,354–4,788 | Mar 8, 1990 |
| Rough Rider #1 | Neas Oper, LLC | Active | Disposal | 62.9K | 10,000 | 4,200–5,200 | Mar 12, 2013 |
| Mansfield "A" #4 | Stephens & Johnson Oper Co | Active | Enhanced recovery | 48.7K | 1,000 | 6,070–6,080 | Mar 23, 1990 |
| Billy's Creek #4 | Stephens & Johnson Oper Co | Active | Disposal | 9.9K | 1,500 | 4,432–4,462 | Feb 26, 1990 |
| Tascosa SWD #1 | Edh Disposals LLC | Active | Disposal | — | 10,000 | 4,585–6,600 | Oct 29, 2014 |
| Alamosa 315 #10 | LDX Oper Co, LLC | Active | Disposal | — | 6,000 | 4,300–4,750 | Jul 8, 2025 |
| Paint Ridge Unit #1618 | Presidio Petro LLC | Active | Enhanced recovery | — | 4,000 | 9,100–9,626 | May 27, 2016 |
| Paint Ridge Unit #115K | Presidio Petro LLC | Active | Enhanced recovery | — | 4,000 | 9,080–9,630 | May 27, 2016 |
| AD #2R | Arrow Oil & Gas, LLC | Active | Enhanced recovery | — | 2,000 | 5,990–6,284 | May 12, 2008 |
| Aurora #12 | Overflow Engy, LLC | Inactive | Enhanced recovery | — | 20,000 | 7,290–7,730 | Sep 24, 2002 |
| Paint Ridge Unit #8 | Presidio Petro LLC | Cancelled | Enhanced recovery | — | 4,000 | 9,100–9,500 | May 9, 2018 |
| Aurora #6 | Overflow Engy, LLC | Plugged | Enhanced recovery | — | 10,000 | 7,124–7,152 | Jul 24, 2003 |
| Aurora #7 | Overflow Engy, LLC | Plugged | Enhanced recovery | — | 10,000 | 7,080–7,143 | Jul 24, 2003 |
| Aurora #10 | Overflow Engy, LLC | Plugged | Enhanced recovery | — | 10,000 | 7,080–7,166 | Jul 24, 2003 |
| Aurora #15 | Overflow Engy, LLC | Plugged | Enhanced recovery | — | 10,000 | 7,117–7,147 | Jul 24, 2003 |
| Aurora #3 | Overflow Engy, LLC | Plugged | Enhanced recovery | — | 10,000 | 7,114–7,121 | Jul 25, 2005 |
| Aurora #8 | Overflow Engy, LLC | Plugged | Enhanced recovery | — | 10,000 | 7,118–7,205 | Jul 24, 2003 |
| Quien Sabe Ranch "A" #3 | Byng Energy Group, Inc. | Cancelled | Enhanced recovery | — | 10,000 | 6,761–6,950 | Apr 28, 2004 |
| Baca #1 | Sunlight Expl, Inc | Plugged | Enhanced recovery | — | 10,000 | 3,774–4,050 | Sep 16, 2013 |
| Alamosa -315- #3 | Citation Oil & Gas Corp | Plugged | Disposal | — | 6,200 | 4,370–4,722 | Jun 17, 2002 |
| JK #4D | Pride Engy Co | Plugged | Disposal | — | 5,000 | 4,830–4,866 | Jun 28, 1990 |
| Bivins-Lit #301X | APC Oper Partnership | Cancelled | Disposal | — | 4,000 | 9,500–9,731 | Feb 13, 2012 |
| Paint Ridge Unit #1163 | Presidio Petro LLC | Inactive | Enhanced recovery | — | 4,000 | 9,090–9,380 | Oct 23, 2013 |
| Paint Ridge Unit #1164 | Presidio Petro LLC | Inactive | Enhanced recovery | — | 4,000 | 9,000–9,352 | Oct 23, 2013 |
| Paint Ridge Unit #1610 | Presidio Petro LLC | Inactive | Enhanced recovery | — | 4,000 | 9,100–9,424 | Nov 5, 2013 |
| Paint Ridge Unit #1155 | Presidio Petro LLC | Inactive | Enhanced recovery | — | 4,000 | 9,184–9,452 | Nov 19, 2013 |
| Bivins-Lit #115A | Presidio Petro LLC | Inactive | Enhanced recovery | — | 4,000 | 9,220–9,550 | Dec 3, 2013 |
| Aurora #14 | Overflow Engy, LLC | Plugged | Disposal | — | 3,000 | 4,379–4,780 | Mar 27, 1990 |
| Taylor, Jay "D" #1W | Pride Engy Co | Plugged | Enhanced recovery | — | 2,000 | 6,845–6,950 | Aug 31, 1994 |
| Quien Sabe Ranch "A" #4 | Byng Energy Group, Inc. | Cancelled | Disposal | — | 1,500 | 3,916–4,390 | Aug 28, 2007 |
| Mansfield "A" #4 | Baker & Taylor Drilling Co | Cancelled | Enhanced recovery | — | 1,000 | 6,070–6,080 | Mar 23, 1990 |
| Aurora #4 | Overflow Engy, LLC | Plugged | Enhanced recovery | — | 700 | 7,062–7,148 | Aug 31, 1993 |
| Aurora #9 | Rio Petro, Inc | Cancelled | Enhanced recovery | — | 700 | 7,156–7,161 | Aug 31, 1993 |
| Aurora #11 | Rio Petro, Inc | Cancelled | Enhanced recovery | — | 700 | 7,100–7,115 | Aug 31, 1993 |
| Aurora #13 | Overflow Engy, LLC | Plugged | Enhanced recovery | — | 700 | 7,090–7,115 | Aug 31, 1993 |
| Bivins SWD #2302 | Adams Affiliates, Inc | Cancelled | Enhanced recovery | — | 600 | 2,592–2,900 | Mar 6, 2012 |
| Taylor, Jay "C" #1026W | Baker & Taylor Drilling Co | Cancelled | Enhanced recovery | — | 377 | 6,678–6,702 | Sep 6, 1979 |
| Mansfield "A" #1 | Baker & Taylor Drilling Co | Cancelled | Enhanced recovery | — | — | — | Nov 23, 1982 |
| Sunshine #1 | Pride Engy Co | Plugged | Disposal | — | — | 4,784–4,820 | Dec 8, 1982 |
Latest disposal drilling permits
W-1 drilling permits in the county tagged as produced-water disposal.
| Issued | Permit | Operator | Lease / well |
|---|---|---|---|
| Nov 17, 2014 | 800120 | Overflow Energy, LLC | Boys Ranch SWD #1 35930408 |
About this data
RRC UIC well master and H-10 injection reports, settled through Jun 2025; TexNet daily injection for the last settled month; disposal permit tags from Petrora's sector classifier.
Developers: this page as JSON is GET /v1/data/water/tx/oldham, documented in the API reference.