NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-24693 · ARTESIA DISTRICT
Travis E Federal #002
ActiveVertical oil well
- Operator
- Cameron Oil & Gas Inc
- County
- Eddy
A vertical oil well in Eddy County, New Mexico, operated by Cameron Oil & Gas Inc. OCD status: active.
Spudded April 8, 1984 and drilled to 2,800 ft measured depth.
Completed in one pool: Loco Hills; QU-GB-SA.
It has reported 66,702 bbl of oil, 49,780 Mcf of gas, and 185,350 bbl of water since December 1992; in the twelve months through August 2026, 23 bbl, 0 Mcf, and 257 bbl.
- 23
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 257
- bbl produced water, same 12 months
- 66,702
- bbl oil since Dec 1992 · 49,780 Mcf gas
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
Last 12 months 23 · prior 12 118(-81%)
Travis E Federal #002: Oil by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Loco Hills; QU-GB-SA | Active · Pumping | — | — | Dec 1992 to Feb 2026 | 66,702 | 49,780 | 185,350 |
Operators of record
| Operator | From | To |
|---|---|---|
| Cameron Oil & Gas Inc | Feb 26, 2026 | today |
| OLEUM Energy LLC | Jun 29, 2023 | Feb 26, 2026 |
| Tandem Energy Corporation | Sep 1, 2005 | Jun 29, 2023 |
| Arrowhead Operating Inc. | May 1, 2003 | Sep 1, 2005 |
| Pecos Production Company | Jan 15, 2003 | May 1, 2003 |
| Anadarko Petroleum Corp | Apr 1, 1984 | Jan 15, 2003 |
Well record
- API number
- 30-015-24693
- Location
- M-6-18S-29E · 500 FSL, 500 FWL
- Coordinates
- 32.77051, -104.11999 ↗
- Measured depth
- 2,800 ft
- True vertical depth
- 2,800 ft
- Land
- Federal
- Property
- Travis E Federal
- APD
- Approved Apr 1, 1984
- Spudded
- Apr 8, 1984
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3001524693, documented in the API reference.