NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-30307 · ARTESIA DISTRICT

Schley Federal #008

ActiveVertical oil well

County
Eddy

A vertical oil well in Eddy County, New Mexico, operated by Spur Energy Partners LLC. OCD status: active.

Spudded April 1, 1999 and drilled to 5,140 ft measured depth.

Completed in one pool: Empire; Glorieta-Yeso, East.

It has reported 75,620 bbl of oil, 421,881 Mcf of gas, and 96,613 bbl of water since June 1999; in the twelve months through August 2026, 865 bbl, 5,183 Mcf, and 1,439 bbl.

865
bbl oil, 12 months through Aug 2026
5,183
Mcf gas, same 12 months
1,439
bbl produced water, same 12 months
75,620
bbl oil since Jun 1999 · 421,881 Mcf gas

Wells nearby

Every well with a location on file around this one, in any state, nearest first.

Loading the wells nearby…

Open the full map →

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

12 months through Aug 2026 865 · prior 12 894(-3%)

05001K1.5K200020012002200320042005200620072008200920102011201220132014201520162017201820192020202120222023202420252026

Schley Federal #008: Oil by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Empire; Glorieta-Yeso, EastActive · Pumping4,701 to 5,045Jun 10, 1999Jun 1999 to Aug 202675,620421,88196,613

Operators of record

OperatorFromTo
Spur Energy Partners LLCDec 10, 2019today
COG Operating LLCMar 1, 2006Dec 10, 2019
Mack Energy CorpJun 15, 1998Mar 1, 2006

Well record

API number
30-015-30307
Location
F-29-17S-29E · 1580 FNL, 1650 FWL
Ground elevation
3,607 ft
Measured depth
5,140 ft
True vertical depth
5,140 ft
Perforations
4,701 to 5,045 ft
Land
Federal
Property
Schley Federal
APD
Approved Jun 15, 1998
Proposed formation
Yeso
Target depth
5,800 ft
Spudded
Apr 1, 1999

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001530307, documented in the API reference.