NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-30794 · ARTESIA DISTRICT
Remuda Basin State #010
PluggedVertical oil wellOCD status: Plugged (site released)
- Operator
- XTO Energy, Inc
- County
- Eddy
A vertical oil well in Eddy County, New Mexico, operated by XTO Energy, Inc. OCD status: plugged (site released).
Spudded November 30, 1999 and drilled to 4,250 ft measured depth; plugged August 19, 2021.
Completed in 2 pools: Nash Draw; Delaware/BS (Avalon Sand), Forty Niner Ridge; Delaware, SW (O).
It has reported 32,871 bbl of oil, 46,812 Mcf of gas, and 622,662 bbl of water since January 2000; its last reported production was September 2019.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 32,871
- bbl oil since Jan 2000 · 46,812 Mcf gas
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
Last 12 months 0 · prior 12 0
Remuda Basin State #010: Oil by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Nash Draw; Delaware/BS (Avalon Sand) | Plugged · Pumping | 9,999 to 9,999 | — | Mar 2003 to Sep 2019 | 9,872 | 14,050 | 496,177 |
| Forty Niner Ridge; Delaware, SW (O) | Plugged · Pumping | 4,048 to 4,068 | Dec 31, 1999 | Jan 2000 to Jan 2003 | 22,999 | 32,762 | 126,485 |
Operators of record
| Operator | From | To |
|---|---|---|
| XTO Energy, Inc | Aug 1, 2004 | today |
| Chevron U S A Inc | May 1, 2002 | Aug 1, 2004 |
| Texaco Exploration & Production Inc | Oct 27, 1999 | May 1, 2002 |
Well record
- API number
- 30-015-30794
- Location
- M-30-23S-30E · 825 FSL, 825 FWL
- Coordinates
- 32.27084, -103.92693 ↗
- Ground elevation
- 3,064 ft
- Measured depth
- 4,250 ft
- True vertical depth
- 4,250 ft
- Perforations
- 4,048 to 9,999 ft
- Land
- State
- Property
- Remuda Basin State
- APD
- Approved Oct 27, 1999
- Proposed formation
- Bell Canyon
- Target depth
- 4,400 ft
- Spudded
- Nov 30, 1999
- Plugged
- Aug 19, 2021
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3001530794, documented in the API reference.