WELLS · 30-015-32463 · NEW MEXICO · ARTESIA DISTRICT
Tony Federal #029
PluggedVertical gas wellOCD status: Plugged (site released)
- Operator
- Apache Corporation
- County
- Eddy
A vertical gas well in Eddy County, New Mexico, operated by Apache Corporation. OCD status: plugged (site released).
Spudded October 30, 2002 and drilled to 11,760 ft measured depth; plugged January 25, 2024.
Completed in 3 pools: Cedar Lake; Glorieta-Yeso, Cedar Lake; Morrow, North (Gas), Henshaw; Wolfcamp, SE (O).
It has reported 59,946 bbl of oil, 285,784 Mcf of gas, and 330,498 bbl of water since March 2003; its last reported production was November 2023.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 59,946
- bbl oil since Mar 2003 · 285,784 Mcf gas
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
Last 12 months 10 · prior 12 3,737(-100%)
Tony Federal #029: Gas by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Cedar Lake; Glorieta-Yeso | Plugged · Pumping | 4,650 to 4,852 | Aug 27, 2005 | Aug 2005 to Nov 2023 | 58,796 | 212,743 | 318,723 |
| Cedar Lake; Morrow, North (Gas) | Plugged · Flowing | 11,229 to 11,236 | Mar 6, 2003 | Mar 2003 to May 2004 | 1,150 | 73,041 | 285 |
| Henshaw; Wolfcamp, SE (O) | Plugged · Pumping | 7,974 to 8,465 | Jul 21, 2005 | — | 0 | 0 | 11,490 |
Operators of record
| Operator | From | To |
|---|---|---|
| Apache Corporation | Oct 28, 2010 | today |
| Marbob Energy Corp | Apr 1, 2005 | Oct 28, 2010 |
| OXY USA WTP Limited Partnership | Oct 3, 2002 | Apr 1, 2005 |
Well record
- API number
- 30-015-32463
- Location
- H-19-17S-31E · 1980 FNL, 860 FEL
- Coordinates
- 32.82183, -103.90332 ↗
- Ground elevation
- 3,618 ft
- Measured depth
- 11,760 ft
- True vertical depth
- 11,760 ft
- Perforations
- 4,650 to 11,236 ft
- Land
- Federal
- Property
- Tony Federal
- APD
- Approved Oct 3, 2002
- Proposed formation
- N Cedar Lake Morrow
- Target depth
- 12,400 ft
- Spudded
- Oct 30, 2002
- Plugged
- Jan 25, 2024
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3001532463, documented in the API reference.