NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-32560 · ARTESIA DISTRICT

Gulf Federal Com #004

PluggedVertical gas wellOCD status: Plugged (not released)

County
Eddy

A vertical gas well in Eddy County, New Mexico, operated by Coterra Energy Operating Co. OCD status: plugged (not released).

Spudded October 23, 2003 and drilled to 12,000 ft measured depth.

Completed in one pool: Carlsbad; Morrow, South (Gas).

It has reported 0 bbl of oil, 422,578 Mcf of gas, and 928 bbl of water since April 2004; its last reported production was October 2019.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
0
bbl oil since Apr 2004 · 422,578 Mcf gas

Wells nearby

Every well with a location on file around this one, in any state, nearest first.

Loading the wells nearby…

Open the full map →

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

12 months through Aug 2026 0 · prior 12 0

05K10K15K2005200620072008200920102011201220132014201520162017201820192020202120222023202420252026

Gulf Federal Com #004: Gas by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Carlsbad; Morrow, South (Gas)Plugged · Flowing11,452 to 11,754Feb 26, 2004Apr 2004 to Oct 20190422,578928
Carlsbad; Strawn, South (Gas)Canceled———000

Operators of record

OperatorFromTo
Coterra Energy Operating Co.Jan 15, 2026today
Cimarex Energy Co. of ColoradoDec 31, 2002Jan 15, 2026

Well record

API number
30-015-32560
Location
D-6-23S-27E · 660 FNL, 660 FWL
Ground elevation
3,258 ft
Measured depth
12,000 ft
True vertical depth
12,000 ft
Perforations
11,452 to 11,754 ft
Land
Private
Property
Gulf Federal Com
APD
Approved Dec 31, 2002
Proposed formation
S Carlsbad Morrow
Target depth
13,500 ft
Spudded
Oct 23, 2003

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001532560, documented in the API reference.