WELLS · 30-015-32580 · NEW MEXICO · ARTESIA DISTRICT
Foster Eddy #017
ActiveVertical gas well
- Operator
- Spur Energy Partners LLC
- County
- Eddy
A vertical gas well in Eddy County, New Mexico, operated by Spur Energy Partners LLC. OCD status: active.
Spudded February 2, 2003 and drilled to 11,920 ft measured depth.
Completed in 3 pools: Cedar Lake; Glorieta-Yeso, Henshaw; Wolfcamp, SE (O), Fren; Cisco-Canyon (O).
It has reported 85,398 bbl of oil, 326,892 Mcf of gas, and 396,778 bbl of water since February 2004; in the twelve months through August 2026, 3,909 bbl, 20,005 Mcf, and 13,615 bbl.
- 3,909
- bbl oil, 12 months through Aug 2026
- 20,005
- Mcf gas, same 12 months
- 13,615
- bbl produced water, same 12 months
- 85,398
- bbl oil since Feb 2004 · 326,892 Mcf gas
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
Last 12 months 20,005 · prior 12 12,839(+56%)
Foster Eddy #017: Gas by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Cedar Lake; Glorieta-Yeso | Active · Pumping | 4,862 to 6,734 | Jun 17, 2009 | Jun 2009 to Aug 2026 | 74,816 | 312,563 | 379,526 |
| Henshaw; Wolfcamp, SE (O) | Plugged · Flowing | 9,215 to 10,345 | Jan 23, 2004 | Feb 2004 to May 2009 | 7,087 | 9,599 | 11,564 |
| Fren; Cisco-Canyon (O) | Plugged · Flowing | 49,215 to 10,345 | Jan 23, 2004 | Feb 2004 to May 2009 | 3,495 | 4,730 | 5,688 |
Operators of record
| Operator | From | To |
|---|---|---|
| Spur Energy Partners LLC | Dec 10, 2019 | today |
| COG Operating LLC | Oct 22, 2010 | Dec 10, 2019 |
| Marbob Energy Corp | Jan 10, 2003 | Oct 22, 2010 |
| OXY USA WTP Limited Partnership | Jan 9, 2003 | Jan 10, 2003 |
Well record
- API number
- 30-015-32580
- Location
- A-17-17S-31E · 660 FNL, 660 FEL
- Coordinates
- 32.83998, -103.88554 ↗
- Ground elevation
- 3,764 ft
- Measured depth
- 11,920 ft
- True vertical depth
- 11,920 ft
- Perforations
- 4,862 to 10,345 ft
- Land
- Federal
- Property
- Foster Eddy
- APD
- Approved Jan 9, 2003
- Proposed formation
- N Cedar Lake Morrow
- Target depth
- 12,400 ft
- Spudded
- Feb 2, 2003
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3001532580, documented in the API reference.