NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-32834 · ARTESIA DISTRICT
Cholla 1 Federal #004
PluggedVertical gas wellOCD status: Plugged (site released)
- Operator
- Matador Production Company
- County
- Eddy
A vertical gas well in Eddy County, New Mexico, operated by Matador Production Company. OCD status: plugged (site released).
Spudded August 6, 2003 and drilled to 12,830 ft measured depth; plugged February 25, 2022.
Completed in one pool: Tamano; Bone Spring.
It has reported 40,639 bbl of oil, 58,695 Mcf of gas, and 48,639 bbl of water since November 2003; its last reported production was January 2021.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 40,639
- bbl oil since Nov 2003 · 58,695 Mcf gas
Wells nearby
Every well with a location on file around this one, in any state, nearest first.
Loading the wells nearby…
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
12 months through Aug 2026 0 · prior 12 0
Cholla 1 Federal #004: Gas by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Tamano; Bone Spring | Plugged · Pumping | 8,646 to 8,655 | Nov 28, 2003 | Nov 2003 to Jan 2021 | 40,639 | 58,695 | 48,639 |
Operators of record
| Operator | From | To |
|---|---|---|
| Matador Production Company | Mar 12, 2015 | today |
| Harvey E Yates Co | Oct 8, 2014 | Mar 12, 2015 |
| Nadel and Gussman Heyco, LLC | Jan 1, 2008 | Oct 8, 2014 |
| Harvey E Yates Co | Jan 10, 2003 | Jan 1, 2008 |
Well record
- API number
- 30-015-32834
- Location
- H-1-18S-31E · 2260 FNL, 400 FEL
- Coordinates
- 32.77767, -103.81577 ↗
- Ground elevation
- 3,815 ft
- Measured depth
- 12,830 ft
- True vertical depth
- 12,830 ft
- Perforations
- 8,646 to 8,655 ft
- Land
- Federal
- Property
- Cholla 1 Federal
- APD
- Approved Jan 10, 2003
- Proposed formation
- E Cedar Lake Morrow E/2
- Target depth
- 12,700 ft
- Spudded
- Aug 6, 2003
- Plugged
- Feb 25, 2022
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3001532834, documented in the API reference.