NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-32836 · ARTESIA DISTRICT
Eagle 35 L Federal #004C
PluggedVertical oil wellOCD status: Plugged (site released)
- Operator
- Redwood Operating LLC
- County
- Eddy
A vertical oil well in Eddy County, New Mexico, operated by Redwood Operating LLC. OCD status: plugged (site released).
Spudded July 31, 2004 and drilled to 2,849 ft measured depth; plugged May 8, 2023.
Completed in 2 pools: Red Lake; Queen-Grayburg-SA, Red Lake; Glorieta-Yeso, Northeast.
It has reported 32,284 bbl of oil, 199,678 Mcf of gas, and 39,114 bbl of water since August 2004; its last reported production was August 2020.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 32,284
- bbl oil since Aug 2004 · 199,678 Mcf gas
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
Last 12 months 0 · prior 12 0
Eagle 35 L Federal #004C: Oil by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Red Lake; Queen-Grayburg-SA | Plugged · Pumping | 1,952 to 3,216 | Oct 3, 2005 | May 2005 to Aug 2020 | 14,169 | 88,966 | 19,155 |
| Red Lake; Glorieta-Yeso, Northeast | Plugged · Pumping | 2,944 to 3,216 | Aug 20, 2004 | Aug 2004 to Aug 2020 | 18,115 | 110,712 | 19,959 |
Operators of record
| Operator | From | To |
|---|---|---|
| Redwood Operating LLC | Sep 18, 2020 | today |
| Lime Rock Resources II-a, L.P. | Dec 27, 2010 | Sep 18, 2020 |
| Devon Energy Production Company, LP | Jun 11, 2003 | Dec 27, 2010 |
Well record
- API number
- 30-015-32836
- Location
- L-35-17S-27E · 1800 FSL, 430 FWL
- Coordinates
- 32.78831, -104.25656 ↗
- Ground elevation
- 3,605 ft
- Measured depth
- 2,849 ft
- True vertical depth
- 3,542 ft
- Perforations
- 1,952 to 3,216 ft
- Land
- Federal
- Property
- Eagle 35 L Federal
- APD
- Approved Jun 11, 2003
- Proposed formation
- Red Lake Glo-Yeso
- Target depth
- 4,000 ft
- Spudded
- Jul 31, 2004
- Plugged
- May 8, 2023
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3001532836, documented in the API reference.