NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-33005 · ARTESIA DISTRICT

Ponderosa 20 State #001

PluggedVertical gas wellOCD status: Plugged (site released)

County
Eddy

A vertical gas well in Eddy County, New Mexico, operated by Chevron U S A Inc. OCD status: plugged (site released).

Spudded November 11, 2003 and drilled to 10,714 ft measured depth; plugged July 25, 2018.

Completed in one pool: Illinois Camp; Morrow, North (Gas).

It has reported 881 bbl of oil, 229,867 Mcf of gas, and 637 bbl of water since December 2004; its last reported production was April 2018.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
881
bbl oil since Dec 2004 · 229,867 Mcf gas

Wells nearby

Every well with a location on file around this one, in any state, nearest first.

Loading the wells nearby…

Open the full map →

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

12 months through Aug 2026 0 · prior 12 0

02K4K2005200620072008200920102011201220132014201520162017201820192020202120222023202420252026

Ponderosa 20 State #001: Gas by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Illinois Camp; Morrow, North (Gas)Plugged · Flowing10,376 to 11,042Feb 22, 2004Dec 2004 to Apr 2018881229,867637

Operators of record

OperatorFromTo
Chevron U S A IncOct 9, 2012today
Chesapeake Operating, Inc.Feb 1, 2004Oct 9, 2012
Concho Resources, Inc.Sep 17, 2003Feb 1, 2004

Well record

API number
30-015-33005
Location
J-20-18S-28E · 1650 FSL, 1550 FEL
Ground elevation
3,578 ft
Measured depth
10,714 ft
True vertical depth
10,714 ft
Perforations
10,376 to 11,042 ft
Land
State
Property
Ponderosa 20 State
APD
Approved Sep 17, 2003
Proposed formation
Morrow
Target depth
10,700 ft
Spudded
Nov 11, 2003
Plugged
Jul 25, 2018

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001533005, documented in the API reference.