WELLS · 30-015-33533 · NEW MEXICO · ARTESIA DISTRICT
Junction Federal #001
ActiveVertical gas well
- Operator
- Premier Oil & Gas Inc
- County
- Eddy
A vertical gas well in Eddy County, New Mexico, operated by Premier Oil & Gas Inc. OCD status: active.
Spudded August 17, 2004 and drilled to 11,420 ft measured depth.
Completed in 3 pools: Henshaw; Wolfcamp, SE (O), Fren; Cisco-Canyon (O), Cedar Lake; Morrow, North (Gas).
It has reported 22,712 bbl of oil, 1,261,659 Mcf of gas, and 5,356 bbl of water since January 2005; in the twelve months through August 2026, 0 bbl, 515 Mcf, and 0 bbl.
- 0
- bbl oil, 12 months through Aug 2026
- 515
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 22,712
- bbl oil since Jan 2005 · 1.3M Mcf gas
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
Last 12 months 515 · prior 12 675(-24%)
Junction Federal #001: Gas by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Henshaw; Wolfcamp, SE (O) | Active · Pumping | 9,161 to 9,427 | Oct 14, 2008 | Oct 2008 to Aug 2026 | 1,096 | 2,099 | 549 |
| Fren; Cisco-Canyon (O) | Active · Pumping | 9,572 to 10,811 | Oct 14, 2008 | Oct 2008 to Aug 2026 | 5,157 | 11,842 | 2,392 |
| Cedar Lake; Morrow, North (Gas) | Plugged · Flowing | 11,196 to 11,235 | Jan 1, 2005 | Jan 2005 to Sep 2008 | 16,459 | 1,247,718 | 2,415 |
Operators of record
| Operator | From | To |
|---|---|---|
| Premier Oil & Gas Inc | Apr 24, 2023 | today |
| Apache Corporation | Oct 28, 2010 | Apr 24, 2023 |
| Marbob Energy Corp | May 25, 2004 | Oct 28, 2010 |
Well record
- API number
- 30-015-33533
- Location
- K-19-17S-31E · 1980 FSL, 1930 FWL
- Coordinates
- 32.81822, -103.91062 ↗
- Ground elevation
- 3,609 ft
- Measured depth
- 11,420 ft
- True vertical depth
- 11,420 ft
- Perforations
- 9,161 to 11,235 ft
- Land
- Federal
- Property
- Junction Federal
- APD
- Approved May 25, 2004
- Proposed formation
- N Cedar Lake Morrow W/2
- Target depth
- 12,000 ft
- Spudded
- Aug 17, 2004
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3001533533, documented in the API reference.