NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-39340 · ARTESIA DISTRICT

Foster Eddy #034

ActiveOil well

County
Eddy

An oil well in Eddy County, New Mexico, operated by Spur Energy Partners LLC. OCD status: active.

Spudded December 17, 2011 and drilled to 6,360 ft measured depth.

Completed in one pool: Cedar Lake; Glorieta-Yeso.

It has reported 61,682 bbl of oil, 330,103 Mcf of gas, and 191,633 bbl of water since March 2012; in the twelve months through August 2026, 298 bbl, 5,654 Mcf, and 2,139 bbl.

298
bbl oil, 12 months through Aug 2026
5,654
Mcf gas, same 12 months
2,139
bbl produced water, same 12 months
61,682
bbl oil since Mar 2012 · 330,103 Mcf gas

Wells nearby

Every well with a location on file around this one, in any state, nearest first.

Loading the wells nearby…

Open the full map →

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

12 months through Aug 2026 298 · prior 12 578(-48%)

02K4K6K20132014201520162017201820192020202120222023202420252026

Foster Eddy #034: Oil by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Cedar Lake; Glorieta-YesoActive · Pumping4,845 to 6,140Jan 24, 2012Mar 2012 to Aug 202661,682330,103191,633

Operators of record

OperatorFromTo
Spur Energy Partners LLCDec 10, 2019today
COG Operating LLCAug 11, 2011Dec 10, 2019

Well record

API number
30-015-39340
Location
H-17-17S-31E · 2046 FNL, 315 FEL
Ground elevation
3,734 ft
Measured depth
6,360 ft
True vertical depth
6,360 ft
Perforations
4,845 to 6,140 ft
Land
Federal
Property
Foster Eddy
APD
Approved Aug 11, 2011
Proposed formation
Glorieta-Yeso Logs 3/23/12
Target depth
6,322 ft
Spudded
Dec 17, 2011

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001539340, documented in the API reference.