NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-39794 · ARTESIA DISTRICT

Poker Lake Unit #413H

PluggedOil wellOCD status: Plugged (site released)

County
Eddy

An oil well in Eddy County, New Mexico, operated by XTO Permian Operating LLC. OCD status: plugged (site released).

Spudded May 27, 2012 and drilled to 15,524 ft measured depth; plugged August 27, 2022.

Completed in one pool: Poker Lake; Delaware, South.

It has reported 203,870 bbl of oil, 1,171,508 Mcf of gas, and 2,048,542 bbl of water since August 2012; its last reported production was August 2022.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
203,870
bbl oil since Aug 2012 · 1.2M Mcf gas

Wells nearby

Every well with a location on file around this one, in any state, nearest first.

Loading the wells nearby…

Open the full map →

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

12 months through Aug 2026 0 · prior 12 0

05K10K15K20132014201520162017201820192020202120222023202420252026

Poker Lake Unit #413H: Oil by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Poker Lake; Delaware, SouthPlugged · Pumping8,372 to 15,524Aug 14, 2012Aug 2012 to Aug 2022203,8701,171,5082,048,542

Operators of record

OperatorFromTo
XTO Permian Operating LLC.May 2, 2019today
Bopco, L.P.Nov 17, 2011May 2, 2019

Well record

API number
30-015-39794
Location
K-28-24S-31E · 2140 FSL, 2200 FWL
Ground elevation
3,465 ft
Measured depth
15,524 ft
True vertical depth
8,163 ft
Perforations
8,372 to 15,524 ft
Land
Federal
Property
Poker Lake Unit
APD
Approved Nov 17, 2011
Proposed formation
Poker Lake Delaware South
Target depth
15,560 ft
Spudded
May 27, 2012
Plugged
Aug 27, 2022

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001539794, documented in the API reference.