NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-39945 · ARTESIA DISTRICT
Crow Flats 14 16 28 USA #002H
ActiveOil well
- Operator
- Mack Energy Corp
- County
- Eddy
An oil well in Eddy County, New Mexico, operated by Mack Energy Corp. OCD status: active.
Spudded April 22, 2012 and drilled to 11,100 ft measured depth.
Completed in one pool: Crow Flats; Wolfcamp.
It has reported 195,085 bbl of oil, 1,060,023 Mcf of gas, and 35,319 bbl of water since June 2012; in the twelve months through August 2026, 147 bbl, 2,292 Mcf, and 40 bbl.
- 147
- bbl oil, 12 months through Aug 2026
- 2,292
- Mcf gas, same 12 months
- 40
- bbl produced water, same 12 months
- 195,085
- bbl oil since Jun 2012 · 1.1M Mcf gas
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
Last 12 months 147 · prior 12 246(-40%)
Crow Flats 14 16 28 USA #002H: Oil by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Crow Flats; Wolfcamp | Active · Pumping | 6,786 to 10,549 | Jun 14, 2012 | Jun 2012 to Aug 2026 | 195,085 | 1,060,023 | 35,319 |
Operators of record
| Operator | From | To |
|---|---|---|
| Mack Energy Corp | Jan 16, 2024 | today |
| Chevron U S A Inc | Oct 9, 2012 | Jan 16, 2024 |
| Chesapeake Operating, Inc. | Feb 14, 2012 | Oct 9, 2012 |
Well record
- API number
- 30-015-39945
- Location
- E-14-16S-28E · 1980 FNL, 10 FWL
- Coordinates
- 32.92548, -104.15527 ↗
- Ground elevation
- 3,575 ft
- Measured depth
- 11,100 ft
- True vertical depth
- 66,049 ft
- Perforations
- 6,786 to 10,549 ft
- Land
- Federal
- Property
- Crow Flats 14 16 28 USA
- APD
- Approved Feb 14, 2012
- Proposed formation
- Wolfcamp
- Target depth
- 11,237 ft
- Spudded
- Apr 22, 2012
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3001539945, documented in the API reference.