WELLS · 30-015-40876 · NEW MEXICO · ARTESIA DISTRICT

Geronimo 28 State SWD #002

ActiveSalt water disposal well

County
Eddy

A salt water disposal well in Eddy County, New Mexico, operated by Hilcorp Energy Company. OCD status: active.

Spudded March 28, 2013 and drilled to 9 ft measured depth.

Completed in one pool: SWD; Wolfcamp-Cisco.

It has taken 2,049,033 bbl of injected water since September 2013, 1,920 bbl of it in the twelve months through August 2026.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
0
bbl oil since first report · 0 Mcf gas

Reported injection

2,049,033 bbl of water injected since Sep 2013. Reported through Aug 2026.

Last 12 months 1,920 · prior 12 17,621(-89%)

050K100K150K2014201520162017201820192020202120222023202420252026

Geronimo 28 State SWD #002: Injected water by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
SWD; Wolfcamp-CiscoActive7,434 to 9,150Aug 20, 2013—000
SWD; Dev-Fus-Mon-Simp-EllCanceled9 to 9——000

Operators of record

OperatorFromTo
Hilcorp Energy CompanyAug 1, 2025today
Apache CorporationDec 7, 2012Aug 1, 2025

Well record

API number
30-015-40876
Location
I-28-17S-28E · 2135 FSL, 690 FEL
Ground elevation
3,685 ft
Measured depth
9 ft
True vertical depth
9 ft
Perforations
9 to 9,150 ft
Land
State
Property
Geronimo 28 State SWD
APD
Approved Dec 7, 2012
Proposed formation
Dev/Ellenbrgr SWD-1378
Target depth
12,500 ft
Spudded
Mar 28, 2013

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001540876, documented in the API reference.