NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-41815 · ARTESIA DISTRICT
Hobgoblin 7 Federal Com Ubb #004H
PluggedHorizontal oil wellOCD status: Plugged (site released)
- Operator
- Spur Energy Partners LLC
- County
- Eddy
A horizontal oil well in Eddy County, New Mexico, operated by Spur Energy Partners LLC. OCD status: plugged (site released).
Spudded March 25, 2014 and drilled to 9,529 ft measured depth; plugged May 26, 2025.
Completed in 2 pools: Loco Hills; Glorieta-Yeso, Square Lake; Grayburg-San Andres.
It has reported 100,000 bbl of oil, 161,940 Mcf of gas, and 275,184 bbl of water since May 2014; its last reported production was February 2019.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 100,000
- bbl oil since May 2014 · 161,940 Mcf gas
Wells nearby
Every well with a location on file around this one, in any state, nearest first.
Loading the wells nearby…
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
12 months through Aug 2026 0 · prior 12 0
Hobgoblin 7 Federal Com Ubb #004H: Oil by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Loco Hills; Glorieta-Yeso | Plugged · Pumping | — | May 27, 2014 | May 2014 to Feb 2019 | 100,000 | 161,940 | 275,184 |
| Square Lake; Grayburg-San Andres | Permitted, not spudded | — | — | — | 0 | 0 | 0 |
Operators of record
| Operator | From | To |
|---|---|---|
| Spur Energy Partners LLC | Dec 10, 2019 | today |
| COG Operating LLC | Nov 14, 2013 | Dec 10, 2019 |
Well record
- API number
- 30-015-41815
- Location
- H-7-17S-30E · 2310 FNL, 150 FEL
- Coordinates
- 32.85007, -104.00328 ↗
- Ground elevation
- 3,671 ft
- Measured depth
- 9,529 ft
- True vertical depth
- 5,025 ft
- Land
- Federal
- Property
- Hobgoblin 7 Federal Com Ubb
- APD
- Approved Nov 14, 2013
- Proposed formation
- Cibp @ 4550 W/10 SX Cement
- Target depth
- 10,097 ft
- Spudded
- Mar 25, 2014
- Plugged
- May 26, 2025
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3001541815, documented in the API reference.