NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-42910 · ARTESIA DISTRICT
Cedar Lake Federal CA #655H
ActiveHorizontal oil well
- Operator
- Hilcorp Energy Company
- County
- Eddy
A horizontal oil well in Eddy County, New Mexico, operated by Hilcorp Energy Company. OCD status: active.
Spudded June 10, 2015 and drilled to 10,992 ft measured depth.
Completed in one pool: Cedar Lake; Glorieta-Yeso.
It has reported 175,998 bbl of oil, 301,737 Mcf of gas, and 961,047 bbl of water since September 2015; in the twelve months through August 2026, 1,659 bbl, 5,397 Mcf, and 32,753 bbl.
- 1,659
- bbl oil, 12 months through Aug 2026
- 5,397
- Mcf gas, same 12 months
- 32,753
- bbl produced water, same 12 months
- 175,998
- bbl oil since Sep 2015 · 301,737 Mcf gas
Wells nearby
Every well with a location on file around this one, in any state, nearest first.
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
12 months through Aug 2026 1,659 · prior 12 2,193(-24%)
Cedar Lake Federal CA #655H: Oil by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Cedar Lake; Glorieta-Yeso | Active · Pumping | — | Sep 17, 2015 | Sep 2015 to Aug 2026 | 175,998 | 301,737 | 961,047 |
Operators of record
| Operator | From | To |
|---|---|---|
| Hilcorp Energy Company | Jul 22, 2025 | today |
| Apache Corporation | Jan 22, 2015 | Jul 22, 2025 |
Well record
- API number
- 30-015-42910
- Location
- A-6-17S-31E · 395 FNL, 1025 FEL
- Coordinates
- 32.86965, -103.90406 ↗
- Ground elevation
- 3,770 ft
- Measured depth
- 10,992 ft
- True vertical depth
- 5,344 ft
- Land
- Federal
- Property
- Cedar Lake Federal CA
- APD
- Approved Jan 13, 2015
- Target depth
- 11,096 ft
- Spudded
- Jun 10, 2015
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3001542910, documented in the API reference.