NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-43510 · ARTESIA DISTRICT
Lago Real Federal #001H
CanceledHorizontal oil wellOCD status: Cancelled
- Operator
- XTO Energy, Inc
- County
- Eddy
A horizontal oil well in Eddy County, New Mexico, operated by XTO Energy, Inc. OCD status: cancelled.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 0
- bbl oil since first report · 0 Mcf gas
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Willow Lake; Bone Spring, Southeast | Canceled | — | — | — | 0 | 0 | 0 |
Operators of record
| Operator | From | To |
|---|---|---|
| XTO Energy, Inc | Dec 17, 2015 | today |
Well record
- API number
- 30-015-43510
- Location
- L-29-24S-29E · 2470 FSL, 660 FWL
- Coordinates
- 32.18792, -104.01304 ↗
- Ground elevation
- 2,922 ft
- Land
- Federal
- Property
- Lago Real Federal
- APD
- Canceled Dec 4, 2015, canceled Mar 13, 2017
- Proposed formation
- Cancelled at Operator's Request
- Target depth
- 13,251 ft
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3001543510, documented in the API reference.