NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-43523 · ARTESIA DISTRICT
Cedar Lake Federal CA #412H
ActiveHorizontal oil well
- Operator
- Hilcorp Energy Company
- County
- Eddy
A horizontal oil well in Eddy County, New Mexico, operated by Hilcorp Energy Company. OCD status: active.
Spudded June 20, 2017 and drilled to 11,040 ft measured depth.
Completed in one pool: Cedar Lake; Glorieta-Yeso.
It has reported 246,415 bbl of oil, 519,625 Mcf of gas, and 560,185 bbl of water since December 2017; in the twelve months through August 2026, 7,376 bbl, 43,395 Mcf, and 36,553 bbl.
- 7,376
- bbl oil, 12 months through Aug 2026
- 43,395
- Mcf gas, same 12 months
- 36,553
- bbl produced water, same 12 months
- 246,415
- bbl oil since Dec 2017 · 519,625 Mcf gas
Wells nearby
Every well with a location on file around this one, in any state, nearest first.
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
12 months through Aug 2026 7,376 · prior 12 7,585(-3%)
Cedar Lake Federal CA #412H: Oil by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Cedar Lake; Glorieta-Yeso | Active · Pumping | — | Dec 14, 2017 | Dec 2017 to Aug 2026 | 246,415 | 519,625 | 560,185 |
Operators of record
| Operator | From | To |
|---|---|---|
| Hilcorp Energy Company | Jul 22, 2025 | today |
| Apache Corporation | Dec 17, 2015 | Jul 22, 2025 |
Well record
- API number
- 30-015-43523
- Location
- A-4-17S-31E · 1019 FNL, 952 FEL
- Coordinates
- 32.86999, -103.85001 ↗
- Ground elevation
- 3,959 ft
- Measured depth
- 11,040 ft
- True vertical depth
- 5,300 ft
- Land
- Federal
- Property
- Cedar Lake Federal CA
- APD
- Approved Dec 15, 2015
- Target depth
- 11,083 ft
- Spudded
- Jun 20, 2017
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3001543523, documented in the API reference.