WELLS · 30-015-45593 · NEW MEXICO · ARTESIA DISTRICT

Corral Canyon Federal #221H

ActiveHorizontal oil well

County
Eddy

A horizontal oil well in Eddy County, New Mexico, operated by XTO Energy, Inc. OCD status: active.

Spudded July 6, 2019 and drilled to 16,970 ft measured depth.

Completed in one pool: Willow Lake; Bone Spring, Southeast.

It has reported 624,353 bbl of oil, 2,528,335 Mcf of gas, and 2,264,542 bbl of water since August 2020; in the twelve months through August 2026, 45,766 bbl, 301,196 Mcf, and 280,836 bbl.

45,766
bbl oil, 12 months through Aug 2026
301,196
Mcf gas, same 12 months
280,836
bbl produced water, same 12 months
624,353
bbl oil since Aug 2020 · 2.5M Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 45,766 · prior 12 73,483(-38%)

020K40K60K202120222023202420252026

Corral Canyon Federal #221H: Oil by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Willow Lake; Bone Spring, SoutheastActive—Aug 30, 2020Aug 2020 to Aug 2026624,3532,528,3352,264,542

Operators of record

OperatorFromTo
XTO Energy, IncJan 9, 2019today

Well record

API number
30-015-45593
Location
J-10-25S-29E · 1895 FSL, 2080 FEL
Ground elevation
3,035 ft
Measured depth
16,970 ft
True vertical depth
8,832 ft
Land
Federal
Property
Corral Canyon Federal
APD
Approved Dec 21, 2018
Target depth
17,036 ft
Spudded
Jul 6, 2019

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001545593, documented in the API reference.