NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-46131 · ARTESIA DISTRICT

Jack Sleeper State Com 9 16 23S 28E #201H

ActiveHorizontal gas well

County
Eddy

A horizontal gas well in Eddy County, New Mexico, operated by Matador Production Company. OCD status: active.

Spudded July 13, 2019 and drilled to 19,892 ft measured depth.

Completed in one pool: Purple Sage; Wolfcamp (Gas).

It has reported 461,754 bbl of oil, 1,719,086 Mcf of gas, and 2,397,519 bbl of water since January 2020; in the twelve months through August 2026, 22,517 bbl, 216,189 Mcf, and 181,551 bbl.

22,517
bbl oil, 12 months through Aug 2026
216,189
Mcf gas, same 12 months
181,551
bbl produced water, same 12 months
461,754
bbl oil since Jan 2020 · 1.7M Mcf gas

Wells nearby

Every well with a location on file around this one, in any state, nearest first.

Loading the wells nearby…

Open the full map →

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

12 months through Aug 2026 216,189 · prior 12 135,406(+60%)

050K100K2020202120222023202420252026

Jack Sleeper State Com 9 16 23S 28E #201H: Gas by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Purple Sage; Wolfcamp (Gas)Active · Flowing—Jan 19, 2020Jan 2020 to Aug 2026461,7541,719,0862,397,519

Operators of record

OperatorFromTo
Matador Production CompanyJun 26, 2019today

Well record

API number
30-015-46131
Location
M-4-23S-28E · 197 FSL, 126 FWL
Ground elevation
3,014 ft
Measured depth
19,892 ft
True vertical depth
9,483 ft
Land
State
Property
Jack Sleeper State Com 9 16 23S 28E
APD
Approved Jun 19, 2019
Proposed formation
Wolfcamp
Target depth
19,600 ft
Spudded
Jul 13, 2019

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001546131, documented in the API reference.