WELLS · 30-015-49222 · NEW MEXICO · ARTESIA DISTRICT

Dr Ellis #123H

ActiveHorizontal oil wellOCD status: New

County
Eddy

A horizontal oil well in Eddy County, New Mexico, operated by Matador Production Company. OCD status: new.

Spudded April 8, 2023.

Completed in 2 pools: Pierce Crossing; Bone Spring, Malaga; Bone Spring.

It has reported 291,261 bbl of oil, 759,009 Mcf of gas, and 1,136,634 bbl of water since July 2023; in the twelve months through August 2026, 39,495 bbl, 205,948 Mcf, and 256,051 bbl.

39,495
bbl oil, 12 months through Aug 2026
205,948
Mcf gas, same 12 months
256,051
bbl produced water, same 12 months
291,261
bbl oil since Jul 2023 · 759,009 Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 39,495 · prior 12 71,171(-45%)

020K40K202420252026

Dr Ellis #123H: Oil by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Pierce Crossing; Bone SpringActive——Jul 2023 to Aug 2026291,261759,0091,136,634
Malaga; Bone SpringPermitted, not spudded———000

Operators of record

OperatorFromTo
Matador Production CompanyJan 28, 2022today

Well record

API number
30-015-49222
Location
I-14-24S-28E · 1157 FSL, 756 FEL
Ground elevation
2,973 ft
Land
Private
Property
Dr Ellis
APD
Approved Jan 18, 2022
Proposed formation
Bone Spring
Target depth
18,578 ft
Spudded
Apr 8, 2023

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001549222, documented in the API reference.