WELLS · 30-015-49223 · NEW MEXICO · ARTESIA DISTRICT

Dr Ellis #113H

ActiveHorizontal oil wellOCD status: New

County
Eddy

A horizontal oil well in Eddy County, New Mexico, operated by Matador Production Company. OCD status: new.

Spudded April 23, 2024.

Completed in 2 pools: Pierce Crossing; Bone Spring, Malaga; Bone Spring.

It has reported 270,718 bbl of oil, 2,178,877 Mcf of gas, and 703,734 bbl of water since October 2024; in the twelve months through August 2026, 57,189 bbl, 852,268 Mcf, and 247,931 bbl.

57,189
bbl oil, 12 months through Aug 2026
852,268
Mcf gas, same 12 months
247,931
bbl produced water, same 12 months
270,718
bbl oil since Oct 2024 · 2.2M Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 57,189

020K40K20252026

Dr Ellis #113H: Oil by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Pierce Crossing; Bone SpringActive——Oct 2024 to Aug 2026270,7182,178,877703,734
Malaga; Bone SpringPermitted, not spudded———000

Operators of record

OperatorFromTo
Matador Production CompanyJan 28, 2022today

Well record

API number
30-015-49223
Location
P-14-24S-28E · 1047 FSL, 757 FEL
Ground elevation
2,973 ft
Land
Private
Property
Dr Ellis
APD
Approved Jan 18, 2022
Proposed formation
Bone Spring
Target depth
17,718 ft
Spudded
Apr 23, 2024

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001549223, documented in the API reference.