NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-50048 · ARTESIA DISTRICT

Shanghai R 15 3 Federal Com #803H

ActiveHorizontal gas wellOCD status: New

County
Eddy

A horizontal gas well in Eddy County, New Mexico, operated by XTO Energy, Inc. OCD status: new.

Spudded March 31, 2023.

Completed in one pool: Purple Sage; Wolfcamp (Gas).

It has reported 420,040 bbl of oil, 3,804,026 Mcf of gas, and 1,929,938 bbl of water since March 2024; in the twelve months through August 2026, 80,876 bbl, 1,003,859 Mcf, and 339,781 bbl.

80,876
bbl oil, 12 months through Aug 2026
1.0M
Mcf gas, same 12 months
339,781
bbl produced water, same 12 months
420,040
bbl oil since Mar 2024 · 3.8M Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 1,003,859 · prior 12 1,629,637(-38%)

0200K400K20252026

Shanghai R 15 3 Federal Com #803H: Gas by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Purple Sage; Wolfcamp (Gas)Active——Mar 2024 to Jul 2026420,0403,804,0261,929,938
Willow Lake; Bone Spring, SoutheastCanceled———000

Operators of record

OperatorFromTo
XTO Energy, IncOct 3, 2022today

Well record

API number
30-015-50048
Location
O-15-25S-29E · 300 FSL, 2230 FEL
Ground elevation
3,077 ft
Land
Federal
Property
Shanghai R 15 3 Federal Com
APD
Approved Oct 3, 2022
Proposed formation
Purple Sage Wolfcamp
Target depth
19,619 ft
Spudded
Mar 31, 2023

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001550048, documented in the API reference.