NEW MEXICO · WELLS · EDDY COUNTY · API 30-015-50096 · ARTESIA DISTRICT

Shanghai R 15 3 Federal Com #125H

ActiveHorizontal oil wellOCD status: New

County
Eddy

A horizontal oil well in Eddy County, New Mexico, operated by XTO Energy, Inc. OCD status: new.

Spudded January 31, 2023.

Completed in one pool: Willow Lake; Bone Spring, Southeast.

It has reported 288,700 bbl of oil, 1,350,237 Mcf of gas, and 987,663 bbl of water since July 2024; in the twelve months through August 2026, 64,188 bbl, 469,514 Mcf, and 233,056 bbl.

64,188
bbl oil, 12 months through Aug 2026
469,514
Mcf gas, same 12 months
233,056
bbl produced water, same 12 months
288,700
bbl oil since Jul 2024 · 1.4M Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 64,188 · prior 12 157,873(-59%)

020K40K20252026

Shanghai R 15 3 Federal Com #125H: Oil by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Willow Lake; Bone Spring, SoutheastActive——Jul 2024 to Aug 2026288,7001,350,237987,663

Operators of record

OperatorFromTo
XTO Energy, IncOct 26, 2022today

Well record

API number
30-015-50096
Location
O-15-25S-29E · 330 FSL, 2530 FEL
Ground elevation
3,069 ft
Land
Federal
Property
Shanghai R 15 3 Federal Com
APD
Approved Oct 26, 2022
Target depth
20,473 ft
Spudded
Jan 31, 2023

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001550096, documented in the API reference.