WELLS · 30-015-54850 · NEW MEXICO · ARTESIA DISTRICT

CB SE 5 32 Federal Com 3 #201H

ActiveHorizontal gas wellOCD status: New

County
Eddy

A horizontal gas well in Eddy County, New Mexico, operated by Chevron U S A Inc. OCD status: new.

Spudded January 21, 2025.

Completed in one pool: Cedar Canyon; Bone Spring.

It has reported 144,240 bbl of oil, 433,048 Mcf of gas, and 403,987 bbl of water since October 2025; in the twelve months through August 2026, 144,240 bbl, 433,048 Mcf, and 403,987 bbl.

144,240
bbl oil, 12 months through Aug 2026
433,048
Mcf gas, same 12 months
403,987
bbl produced water, same 12 months
144,240
bbl oil since Oct 2025 · 433,048 Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 433,048

050K100K2026

CB SE 5 32 Federal Com 3 #201H: Gas by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Cedar Canyon; Bone SpringActive——Oct 2025 to Aug 2026144,240433,048403,987

Operators of record

OperatorFromTo
Chevron U S A IncMar 14, 2024today

Well record

API number
30-015-54850
Location
C-8-24S-29E · 351 FNL, 1791 FWL
Ground elevation
3,016 ft
Land
Federal
Property
CB SE 5 32 Federal Com 3
APD
Approved Mar 14, 2024
Proposed formation
Bone Springs
Target depth
19,525 ft
Spudded
Jan 21, 2025

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001554850, documented in the API reference.