WELLS · 30-015-54901 · NEW MEXICO · ARTESIA DISTRICT

Harrold Melton Federal Com #112H

ActiveHorizontal oil wellOCD status: New

County
Eddy

A horizontal oil well in Eddy County, New Mexico, operated by Matador Production Company. OCD status: new.

Spudded April 28, 2024.

Completed in one pool: Pierce Crossing; Bone Spring.

It has reported 301,941 bbl of oil, 2,287,266 Mcf of gas, and 791,817 bbl of water since October 2024; in the twelve months through August 2026, 67,001 bbl, 836,560 Mcf, and 249,135 bbl.

67,001
bbl oil, 12 months through Aug 2026
836,560
Mcf gas, same 12 months
249,135
bbl produced water, same 12 months
301,941
bbl oil since Oct 2024 · 2.3M Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 67,001

020K40K60K20252026

Harrold Melton Federal Com #112H: Oil by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Pierce Crossing; Bone SpringActive——Oct 2024 to Aug 2026301,9412,287,266791,817

Operators of record

OperatorFromTo
Matador Production CompanyApr 2, 2024today

Well record

API number
30-015-54901
Location
H-14-24S-28E · 1395 FNL, 564 FEL
Ground elevation
2,970 ft
Land
Federal
Property
Harrold Melton Federal Com
APD
Approved Apr 2, 2024
Proposed formation
Bone Springs
Target depth
17,785 ft
Spudded
Apr 28, 2024

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001554901, documented in the API reference.