WELLS · 30-015-55063 · NEW MEXICO · ARTESIA DISTRICT

Kathy Kregor Federal Com #114H

ActiveHorizontal oil wellOCD status: New

County
Eddy

A horizontal oil well in Eddy County, New Mexico, operated by Matador Production Company. OCD status: new.

Completed in one pool: Pierce Crossing; Bone Spring.

It has reported 416,818 bbl of oil, 2,649,774 Mcf of gas, and 908,601 bbl of water since October 2024; in the twelve months through August 2026, 92,729 bbl, 959,469 Mcf, and 326,174 bbl.

92,729
bbl oil, 12 months through Aug 2026
959,469
Mcf gas, same 12 months
326,174
bbl produced water, same 12 months
416,818
bbl oil since Oct 2024 · 2.6M Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 92,729

020K40K60K20252026

Kathy Kregor Federal Com #114H: Oil by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Pierce Crossing; Bone SpringActive——Oct 2024 to Aug 2026416,8182,649,774908,601
Willow Lake; Bone Spring,westCanceled———000

Operators of record

OperatorFromTo
Matador Production CompanyMay 23, 2024today

Well record

API number
30-015-55063
Location
P-14-24S-28E · 1046 FSL, 787 FEL
Ground elevation
2,977 ft
Land
Federal
Property
Kathy Kregor Federal Com
APD
Approved May 23, 2024
Proposed formation
Bone Springs
Target depth
17,772 ft

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001555063, documented in the API reference.