WELLS · 30-015-55121 · NEW MEXICO · ARTESIA DISTRICT

Prater 10 9 24S 28E RB #114H

ActiveHorizontal oil wellOCD status: New

County
Eddy

A horizontal oil well in Eddy County, New Mexico, operated by Matador Production Company. OCD status: new.

Spudded December 19, 2024.

Completed in one pool: Malaga; Bone Spring, North.

It has reported 148,078 bbl of oil, 1,019,027 Mcf of gas, and 645,454 bbl of water since June 2025; in the twelve months through August 2026, 111,758 bbl, 936,565 Mcf, and 479,739 bbl.

111,758
bbl oil, 12 months through Aug 2026
936,565
Mcf gas, same 12 months
479,739
bbl produced water, same 12 months
148,078
bbl oil since Jun 2025 · 1.0M Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 111,758

010K20K30K2026

Prater 10 9 24S 28E RB #114H: Oil by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Malaga; Bone Spring, NorthActive——Jun 2025 to Aug 2026148,0781,019,027645,454

Operators of record

OperatorFromTo
Matador Production CompanyJun 4, 2024today

Well record

API number
30-015-55121
Location
L-11-24S-28E · 1771 FSL, 202 FWL
Ground elevation
2,999 ft
Land
Private
Property
Prater 10 9 24S 28E RB
APD
Approved May 14, 2024
Proposed formation
Bone Spring
Target depth
17,721 ft
Spudded
Dec 19, 2024

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001555121, documented in the API reference.