WELLS · 30-015-55330 · NEW MEXICO · ARTESIA DISTRICT

Prater 10 9 24S 28E RB #133H

ActiveHorizontal oil wellOCD status: New

County
Eddy

A horizontal oil well in Eddy County, New Mexico, operated by Matador Production Company. OCD status: new.

Spudded December 16, 2024.

Completed in one pool: Malaga; Bone Spring, North.

It has reported 163,804 bbl of oil, 523,203 Mcf of gas, and 431,560 bbl of water since June 2025; in the twelve months through August 2026, 93,456 bbl, 379,679 Mcf, and 259,599 bbl.

93,456
bbl oil, 12 months through Aug 2026
379,679
Mcf gas, same 12 months
259,599
bbl produced water, same 12 months
163,804
bbl oil since Jun 2025 · 523,203 Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 93,456

020K40K2026

Prater 10 9 24S 28E RB #133H: Oil by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Malaga; Bone Spring, NorthActive——Jun 2025 to Aug 2026163,804523,203431,560

Operators of record

OperatorFromTo
Matador Production CompanyAug 14, 2024today

Well record

API number
30-015-55330
Location
L-11-24S-28E · 1691 FSL, 201 FWL
Ground elevation
2,999 ft
Land
State
Property
Prater 10 9 24S 28E RB
APD
Approved Jul 30, 2024
Proposed formation
Bone Spring
Target depth
18,927 ft
Spudded
Dec 16, 2024

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001555330, documented in the API reference.