WELLS · 30-015-57427 · NEW MEXICO · ARTESIA DISTRICT

Fully Loaded 12 1 Federal Com #241H

Permitted, not spuddedHorizontal oil wellOCD status: New

County
Eddy

A horizontal oil well in Eddy County, New Mexico, operated by Devon Energy Production Company, LP. OCD status: new.

Its APD was approved on November 3, 2025 for a target depth of 16,887 ft; no spud date is on file.

Completed in 2 pools: Pierce Crossing; Bone Spring, East, Cedar Canyon; Bone Spring.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
0
bbl oil since first report · 0 Mcf gas

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Pierce Crossing; Bone Spring, EastPermitted, not spudded———000
Cedar Canyon; Bone SpringPermitted, not spudded———000

Operators of record

OperatorFromTo
Devon Energy Production Company, LPNov 3, 2025today

Well record

API number
30-015-57427
Location
E-12-24S-29E · 1516 FNL, 1183 FWL
Ground elevation
3,099 ft
Land
Federal
Property
Fully Loaded 12 1 Federal Com
APD
Approved Nov 3, 2025
Proposed formation
Bone Spring
Target depth
16,887 ft

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001557427, documented in the API reference.