WELLS · 30-015-57475 · NEW MEXICO · ARTESIA DISTRICT

Fully Loaded 12 1 Federal Com #301H

Permitted, not spuddedHorizontal oil wellOCD status: New

County
Eddy

A horizontal oil well in Eddy County, New Mexico, operated by Devon Energy Production Company, LP. OCD status: new.

Its APD was approved on November 13, 2025 for a target depth of 17,431 ft; no spud date is on file.

Completed in 2 pools: Cedar Canyon; Bone Spring, Pierce Crossing; Bone Spring, East.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
0
bbl oil since first report · 0 Mcf gas

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Cedar Canyon; Bone SpringPermitted, not spudded———000
Pierce Crossing; Bone Spring, EastPermitted, not spudded———000
Malaga; Bone Spring, NorthCanceled———000

Operators of record

OperatorFromTo
Devon Energy Production Company, LPNov 13, 2025today

Well record

API number
30-015-57475
Location
E-12-24S-29E · 1516 FNL, 1213 FWL
Ground elevation
3,100 ft
Land
Federal
Property
Fully Loaded 12 1 Federal Com
APD
Approved Nov 13, 2025
Proposed formation
Bone Spring
Target depth
17,431 ft

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001557475, documented in the API reference.