WELLS · 30-015-58270 · NEW MEXICO · ARTESIA DISTRICT

Jackhammer State #110H

Drilled, not yet activeHorizontal oil wellOCD status: New

County
Eddy

A horizontal oil well in Eddy County, New Mexico, operated by Spur Energy Partners LLC. OCD status: new.

Spudded July 17, 2026; OCD has not recorded it as an active well yet.

Completed in one pool: Artesia; Queen-Grayburg-San Andres.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
0
bbl oil since first report · 0 Mcf gas

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Artesia; Queen-Grayburg-San AndresPermitted, not spudded———000

Operators of record

OperatorFromTo
Spur Energy Partners LLCJun 5, 2026today

Well record

API number
30-015-58270
Location
D-36-17S-28E · 45 FNL, 650 FWL
Ground elevation
3,674 ft
Land
State
Property
Jackhammer State
APD
Approved May 27, 2026
Proposed formation
San Andres
Target depth
8,590 ft
Spudded
Jul 17, 2026

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3001558270, documented in the API reference.