WELLS · 30-021-20026 · NEW MEXICO · SANTA FE DISTRICT
Bravo Dome Carbon Dioxide Gas Unit #041
PluggedVertical co2 wellOCD status: Plugged (site released)
- Operator
- BP America Production Company
- County
- Harding
A vertical co2 well in Harding County, New Mexico, operated by BP America Production Company. OCD status: plugged (site released).
Completed in one pool: Bravo Dome Carbon Dioxide Gas 640.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 0
- bbl oil since first report · 0 Mcf gas
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Bravo Dome Carbon Dioxide Gas 640 | Plugged | 2,281 to 2,368 | — | — | 0 | 0 | 0 |
Operators of record
| Operator | From | To |
|---|---|---|
| BP America Production Company | Sep 5, 1973 | today |
Well record
- API number
- 30-021-20026
- Location
- 4-19N-32E · 660 FNL, 660 FWL
- Coordinates
- 35.91176, -103.55167 ↗
- Ground elevation
- 4,739 ft
- Perforations
- 2,281 to 2,368 ft
- Land
- Federal
- Property
- Bravo Dome Carbon Dioxide Gas Unit
- APD
- Approved Sep 5, 1973
- Proposed formation
- Basement P&a 1998-04-06
- Target depth
- 2,700 ft
- Plugged
- Apr 6, 1998
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3002120026, documented in the API reference.