WELLS · 30-021-20182 · NEW MEXICO · SANTA FE DISTRICT

Bravo Dome Carbon Dioxide Gas Unit #041

PluggedVertical co2 wellOCD status: Plugged (site released)

County
Harding

A vertical co2 well in Harding County, New Mexico, operated by BP America Production Company. OCD status: plugged (site released).

Completed in one pool: Bravo Dome Carbon Dioxide Gas 640.

It has reported 0 bbl of oil, 318,057 Mcf of gas, and 1,465 bbl of water since January 1994; its last reported production was April 1999.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
0
bbl oil since Jan 1994 · 318,057 Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 37,003 · prior 12 45,998(-20%)

020K40K199419951996199719981999

Bravo Dome Carbon Dioxide Gas Unit #041: Gas by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Bravo Dome Carbon Dioxide Gas 640Plugged · Flowing2,380 to 2,470Dec 12, 1984Jan 1994 to Apr 19990318,0571,465

Operators of record

OperatorFromTo
BP America Production CompanyNov 1, 1984today

Well record

API number
30-021-20182
Location
G-4-19N-33E · 1650 FNL, 1650 FEL
Ground elevation
4,970 ft
Perforations
2,380 to 2,470 ft
Land
Private
Property
Bravo Dome Carbon Dioxide Gas Unit
APD
Pending Nov 1, 1984
Proposed formation
Tubb P&a 2000-02-10
Target depth
2,900 ft
Plugged
Feb 10, 2000

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3002120182, documented in the API reference.