WELLS · 30-021-20204 · NEW MEXICO · SANTA FE DISTRICT

Bravo Dome Carbon Dioxide Gas Unit #231

PluggedVertical co2 wellOCD status: Plugged (site released)

County
Harding

A vertical co2 well in Harding County, New Mexico, operated by BP America Production Company. OCD status: plugged (site released).

Completed in one pool: Bravo Dome Carbon Dioxide Gas 640.

It has reported 0 bbl of oil, 175,181 Mcf of gas, and 2,037 bbl of water since January 1994; its last reported production was October 1996.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
0
bbl oil since Jan 1994 · 175,181 Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 0 · prior 12 7,596(-100%)

020K40K19941995199619971998

Bravo Dome Carbon Dioxide Gas Unit #231: Gas by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Bravo Dome Carbon Dioxide Gas 640Plugged · Flowing2,484 to 2,526Jul 16, 1985Jan 1994 to Oct 19960175,1812,037

Operators of record

OperatorFromTo
BP America Production CompanyJun 1, 1985today

Well record

API number
30-021-20204
Location
K-23-18N-33E · 1980 FSL, 1980 FWL
Ground elevation
4,750 ft
Perforations
2,484 to 2,526 ft
Land
Private
Property
Bravo Dome Carbon Dioxide Gas Unit
APD
Approved Jun 1, 1985
Proposed formation
Tubb P&a 1998-01-12
Target depth
2,900 ft
Plugged
Jan 12, 1998

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3002120204, documented in the API reference.