WELLS · 30-021-20211 · NEW MEXICO · SANTA FE DISTRICT

Bravo Dome Carbon Dioxide Gas Unit #231

PluggedVertical co2 wellOCD status: Plugged (site released)

County
Harding

A vertical co2 well in Harding County, New Mexico, operated by BP America Production Company. OCD status: plugged (site released).

Completed in one pool: Bravo Dome Carbon Dioxide Gas 640.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
0
bbl oil since first report · 0 Mcf gas

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Bravo Dome Carbon Dioxide Gas 640Plugged2,056 to 2,109——000

Operators of record

OperatorFromTo
BP America Production CompanyMar 21, 1985today

Well record

API number
30-021-20211
Location
G-23-19N-31E · 1650 FNL, 1650 FEL
Ground elevation
4,483 ft
Perforations
2,056 to 2,109 ft
Land
Federal
Property
Bravo Dome Carbon Dioxide Gas Unit
APD
Approved Mar 21, 1985
Proposed formation
Tubb P&a 1998-01-12
Target depth
2,900 ft
Plugged
Jan 12, 1998

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3002120211, documented in the API reference.