WELLS · 30-021-20244 · NEW MEXICO · SANTA FE DISTRICT

Bravo Dome Carbon Dioxide Gas Unit #221

PluggedVertical co2 wellOCD status: Plugged (site released)

County
Harding

A vertical co2 well in Harding County, New Mexico, operated by BP America Production Company. OCD status: plugged (site released).

Completed in one pool: Bravo Dome Carbon Dioxide Gas 640.

It has reported 0 bbl of oil, 340,823 Mcf of gas, and 0 bbl of water since October 1993; its last reported production was February 1998.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
0
bbl oil since Oct 1993 · 340,823 Mcf gas

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

Last 12 months 12,762 · prior 12 31,128(-59%)

050K100K19941995199619971998

Bravo Dome Carbon Dioxide Gas Unit #221: Gas by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Bravo Dome Carbon Dioxide Gas 640Plugged · Flowing2,400 to 2,480Oct 13, 1993Oct 1993 to Feb 19980340,8230

Operators of record

OperatorFromTo
BP America Production CompanyMay 13, 1993today

Well record

API number
30-021-20244
Location
G-22-20N-33E · 1980 FNL, 1960 FEL
Ground elevation
4,972 ft
Perforations
2,400 to 2,480 ft
Land
Private
Property
Bravo Dome Carbon Dioxide Gas Unit
APD
Approved May 13, 1993
Proposed formation
Tubb P&a 1998-08-10
Target depth
2,502 ft
Plugged
Aug 10, 1998

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3002120244, documented in the API reference.