NEW MEXICO · WELLS · RIO ARRIBA COUNTY · API 30-039-06653 · AZTEC DISTRICT
MKL #016X
PluggedVertical gas wellOCD status: Plugged (site released)
- Operator
- XTO Energy, Inc
- County
- Rio Arriba
A vertical gas well in Rio Arriba County, New Mexico, operated by XTO Energy, Inc. OCD status: plugged (site released).
Spudded June 18, 1953 and drilled to 2,265 ft measured depth; plugged March 31, 2011.
Completed in one pool: Blanco P. C. South (Prorated Gas).
It has reported 0 bbl of oil, 1,202,352 Mcf of gas, and 115 bbl of water in its lifetime; its last reported production was March 2010.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 0
- bbl oil, lifetime · 1.2M Mcf gas
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
12 months through Aug 2026 0 · prior 12 0
MKL #016X: Gas by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Blanco P. C. South (Prorated Gas) | Plugged · Flowing | 2,183 to 2,265 | Jul 12, 1953 | — | 0 | 1,202,352 | 115 |
Operators of record
| Operator | From | To |
|---|---|---|
| XTO Energy, Inc | Jul 1, 2007 | today |
| Dominion Oklahoma Texas Expl. & Prod Inc | Jan 1, 1900 | Jul 1, 2007 |
Well record
- API number
- 30-039-06653
- Location
- P-5-26N-07W · 1025 FSL, 380 FEL
- Coordinates
- 36.51069, -107.59069 ↗
- Ground elevation
- 6,038 ft
- Measured depth
- 2,265 ft
- True vertical depth
- 2,265 ft
- Perforations
- 2,183 to 2,265 ft
- Land
- Federal
- Property
- MKL
- Proposed formation
- P&a 03-31-11
- Spudded
- Jun 18, 1953
- Plugged
- Mar 31, 2011
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3003906653, documented in the API reference.