NEW MEXICO · WELLS · RIO ARRIBA COUNTY · API 30-039-21592 · AZTEC DISTRICT
Valencia Canyon Unit #024
PluggedVertical gas wellOCD status: Plugged (site released)
- Operator
- XTO Energy, Inc
- County
- Rio Arriba
A vertical gas well in Rio Arriba County, New Mexico, operated by XTO Energy, Inc. OCD status: plugged (site released).
Spudded February 26, 1978 and drilled to 4,400 ft measured depth; plugged August 16, 2012.
Completed in one pool: Choza Mesa Pictured Cliffs (Gas).
It has reported 1,508 bbl of oil, 337,834 Mcf of gas, and 5,280 bbl of water since December 1992; its last reported production was July 2012.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 1,508
- bbl oil since Dec 1992 · 337,834 Mcf gas
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
Last 12 months 909 · prior 12 3,519(-74%)
Valencia Canyon Unit #024: Gas by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Choza Mesa Pictured Cliffs (Gas) | Plugged · Flowing | 4,047 to 4,282 | May 24, 1978 | Dec 1992 to Jul 2012 | 1,508 | 337,834 | 5,280 |
Operators of record
| Operator | From | To |
|---|---|---|
| XTO Energy, Inc | Jan 1, 1998 | today |
| BP America Production Company | Sep 1, 1978 | Jan 1, 1998 |
Well record
- API number
- 30-039-21592
- Location
- D-15-28N-04W · 1050 FNL, 1130 FWL
- Coordinates
- 36.66655, -107.24323 ↗
- Ground elevation
- 7,273 ft
- Measured depth
- 4,400 ft
- True vertical depth
- 4,400 ft
- Perforations
- 4,047 to 4,282 ft
- Land
- Federal
- Property
- Valencia Canyon Unit
- APD
- Approved Dec 27, 1977
- Proposed formation
- P&a 8-16-12
- Spudded
- Feb 26, 1978
- Plugged
- Aug 16, 2012
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3003921592, documented in the API reference.