NEW MEXICO · WELLS · RIO ARRIBA COUNTY · API 30-039-22741 · AZTEC DISTRICT
Northeast Haynes #012
ActiveVertical gas well
- Operator
- Hilcorp Energy Company
- County
- Rio Arriba
A vertical gas well in Rio Arriba County, New Mexico, operated by Hilcorp Energy Company. OCD status: active.
Spudded August 7, 1981 and drilled to 2,550 ft measured depth.
Completed in one pool: Ballard Pictured Cliffs (Gas).
It has reported 198 bbl of oil, 674,110 Mcf of gas, and 353 bbl of water in its lifetime; in the twelve months through August 2026, 0 bbl, 8,337 Mcf, and 0 bbl.
- 0
- bbl oil, 12 months through Aug 2026
- 8,337
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 198
- bbl oil, lifetime · 674,110 Mcf gas
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
12 months through Aug 2026 8,337 · prior 12 8,661(-4%)
Northeast Haynes #012: Gas by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Ballard Pictured Cliffs (Gas) | Active · Flowing | 2,383 to 2,456 | Sep 16, 1981 | — | 198 | 674,110 | 353 |
Operators of record
| Operator | From | To |
|---|---|---|
| Hilcorp Energy Company | Sep 29, 2017 | today |
| Conocophillips Company | Jan 1, 2003 | Sep 29, 2017 |
| Conoco Inc | Nov 1, 1981 | Jan 1, 2003 |
Well record
- API number
- 30-039-22741
- Location
- O-16-24N-05W · 1080 FSL, 1650 FEL
- Coordinates
- 36.30843, -107.36304 ↗
- Ground elevation
- 6,676 ft
- Measured depth
- 2,550 ft
- True vertical depth
- 2,550 ft
- Perforations
- 2,383 to 2,456 ft
- Land
- Tribal
- Property
- Northeast Haynes
- APD
- Approved May 4, 1981
- Spudded
- Aug 7, 1981
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3003922741, documented in the API reference.