NEW MEXICO · WELLS · RIO ARRIBA COUNTY · API 30-039-30009 · AZTEC DISTRICT
Jaeco 28 3 #009
CanceledGas wellOCD status: Cancelled
- Operator
- Jicarilla Energy Co
- County
- Rio Arriba
A gas well in Rio Arriba County, New Mexico, operated by Jicarilla Energy Co. OCD status: cancelled.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 0
- bbl oil since first report · 0 Mcf gas
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Blanco-Mesaverde (Prorated Gas) | Canceled | — | — | — | 0 | 0 | 0 |
Operators of record
| Operator | From | To |
|---|---|---|
| Jicarilla Energy Co | Mar 22, 2007 | today |
Well record
- API number
- 30-039-30009
- Location
- P-9-28N-03W · 1250 FSL, 660 FEL
- Coordinates
- 36.65033, -107.14927 ↗
- Ground elevation
- 7,146 ft
- Land
- Tribal
- Property
- Jaeco 28 3
- APD
- Canceled Mar 22, 2007, canceled Feb 21, 2012
- Proposed formation
- Blanco MV
- Target depth
- 6,389 ft
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3003930009, documented in the API reference.