WELLS · 30-039-31115 · NEW MEXICO · AZTEC DISTRICT
State B Com #233F
CanceledVertical gas wellOCD status: Cancelled
- Operator
- Cross Timbers Energy, LLC
- County
- Rio Arriba
- Pool
- Basin Mancos
A vertical gas well in Rio Arriba County, New Mexico, operated by Cross Timbers Energy, LLC. OCD status: cancelled.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 0
- bbl oil since first report · 0 Mcf gas
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Basin Dakota (Prorated Gas) | Canceled | — | — | — | 0 | 0 | 0 |
| Blanco-Mesaverde (Prorated Gas) | Canceled | — | — | — | 0 | 0 | 0 |
| Basin Mancos | Canceled | — | — | — | 0 | 0 | 0 |
Operators of record
| Operator | From | To |
|---|---|---|
| Cross Timbers Energy, LLC | Jul 17, 2013 | today |
| XTO Energy, Inc | Apr 30, 2012 | Jul 17, 2013 |
Well record
- API number
- 30-039-31115
- Location
- L-16-26N-06W · 2454 FSL, 1209 FWL
- Coordinates
- 36.48656, -107.47823 ↗
- Ground elevation
- 6,680 ft
- Land
- State
- Property
- State B Com
- APD
- Canceled Apr 30, 2012, canceled Feb 24, 2015
- Proposed formation
- DK/MV/Mc
- Target depth
- 7,650 ft
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3003931115, documented in the API reference.