NEW MEXICO · WELLS · RIO ARRIBA COUNTY · API 30-039-60060 · AZTEC DISTRICT
Breech a #133
ActiveVertical gas well
- Operator of record
- CTOC Energy, LLC
- County
- Rio Arriba
A vertical gas well in Rio Arriba County, New Mexico, operated by CTOC Energy, LLC. OCD status: active.
Spudded December 4, 1951 and drilled to 3,118 ft measured depth.
Completed in one pool: Blanco P. C. South (Prorated Gas).
It has reported 0 bbl of oil, 971,619 Mcf of gas, and 60 bbl of water in its lifetime; in the twelve months through September 2026, 0 bbl, 3,914 Mcf, and 0 bbl.
- 0
- bbl oil, 12 months through Sep 2026
- 3,914
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 0
- bbl oil, lifetime · 971,619 Mcf gas
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
12 months through Sep 2026 3,914 · prior 12 3,898(+0%)
Breech a #133: Gas by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Blanco P. C. South (Prorated Gas) | Active · Flowing | 3,048 to 3,118 | Feb 8, 1952 | — | 0 | 971,619 | 60 |
Operators of record
| Operator | From | To |
|---|---|---|
| CTOC Energy, LLC | Jun 24, 2026 | today |
| Cross Timbers Energy, LLC | Jul 17, 2013 | Jun 24, 2026 |
| XTO Energy, Inc | Feb 1, 2008 | Jul 17, 2013 |
| Caulkins Oil Co | Jan 1, 1900 | Feb 1, 2008 |
Well record
- API number
- 30-039-60060
- Location
- D-10-26N-06W · 1150 FNL, 1100 FWL
- Coordinates
- 36.50598, -107.45979 ↗
- Ground elevation
- 6,586 ft
- Measured depth
- 3,118 ft
- True vertical depth
- 3,118 ft
- Perforations
- 3,048 to 3,118 ft
- Land
- Federal
- Property
- Breech A
- Spudded
- Dec 4, 1951
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Sep 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3003960060, documented in the API reference.