NEW MEXICO · WELLS · SAN JUAN COUNTY · API 30-045-10619 · AZTEC DISTRICT

Ute Mountain #008

PluggedVertical oil wellOCD status: Plugged (site released)

County
San Juan

A vertical oil well in San Juan County, New Mexico, operated by Benson-Montin-Greer Drilling Corp. OCD status: plugged (site released).

Spudded October 2, 1959 and drilled to 2,904 ft measured depth; plugged June 4, 1992.

Completed in one pool: Verde Gallup.

It has reported 93,978 bbl of oil, 45,768 Mcf of gas, and 4 bbl of water in its lifetime; its last reported production was null.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
93,978
bbl oil, lifetime · 45,768 Mcf gas

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Verde GallupPlugged · Pumping2,765 to 2,904Oct 20, 1959—93,97845,7684

Operators of record

OperatorFromTo
Benson-Montin-Greer Drilling CorpJan 1, 1900today

Well record

API number
30-045-10619
Location
I-21-31N-14W · 1980 FSL, 660 FEL
Ground elevation
5,599 ft
Measured depth
2,904 ft
True vertical depth
2,904 ft
Perforations
2,765 to 2,904 ft
Land
Tribal
Property
Ute Mountain
APD
Approved Oct 1, 1959
Proposed formation
Verde Gallup (P&a 6-4-92)
Target depth
2,904 ft
Spudded
Oct 2, 1959
Plugged
Jun 4, 1992

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3004510619, documented in the API reference.