NEW MEXICO · WELLS · SAN JUAN COUNTY · API 30-045-20126 · AZTEC DISTRICT

Bolin Hardie #001

PluggedVertical gas wellOCD status: Plugged (site released)

Operator of record
Hilcorp Energy Company
County
San Juan

A vertical gas well in San Juan County, New Mexico, operated by Hilcorp Energy Company. OCD status: plugged (site released).

Spudded August 15, 1967 and drilled to 7,529 ft measured depth; plugged December 4, 2018.

Completed in one pool: Basin Dakota (Prorated Gas).

It has reported 8,743 bbl of oil, 865,771 Mcf of gas, and 4,792 bbl of water in its lifetime; its last reported production was May 2018.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
8,743
bbl oil, lifetime · 865,771 Mcf gas

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Reported production

Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.

12 months through Aug 2026 0 · prior 12 0

05K10K19941996199820002002200420062008201020122014201620182020202220242026

Bolin Hardie #001: Gas by month.

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Basin Dakota (Prorated Gas)Plugged · Flowing7,354 to 7,470Aug 26, 1967—8,743865,7714,792
Blanco-Mesaverde (Prorated Gas)Canceled———000

Operators of record

OperatorFromTo
Hilcorp Energy CompanyAug 1, 2017today
Conocophillips CompanyJan 1, 2003Aug 1, 2017
Conoco IncNov 1, 1994Jan 1, 2003
Nassau Resources IncJan 1, 1900Nov 1, 1994

Well record

API number
30-045-20126
Location
D-34-29N-08W · 880 FNL, 1170 FWL
Ground elevation
6,402 ft
Measured depth
7,529 ft
True vertical depth
7,529 ft
Perforations
7,354 to 7,470 ft
Land
Federal
Property
Bolin Hardie
APD
Approved Aug 15, 1967
Proposed formation
DK
Spudded
Aug 15, 1967
Plugged
Dec 4, 2018

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3004520126, documented in the API reference.