NEW MEXICO · WELLS · SAN JUAN COUNTY · API 30-045-31220 · AZTEC DISTRICT
Hoover #002
PluggedVertical gas wellOCD status: Plugged (site released)
- Operator of record
- Hilcorp Energy Company
- County
- San Juan
A vertical gas well in San Juan County, New Mexico, operated by Hilcorp Energy Company. OCD status: plugged (site released).
Spudded November 19, 2002 and drilled to 1,380 ft measured depth; plugged February 3, 2026.
Completed in one pool: Harper Hill Fruitland Sand PC (Gas).
It has reported 0 bbl of oil, 237,538 Mcf of gas, and 283,852 bbl of water since July 2003; its last reported production was May 2017.
- 0
- bbl oil, 12 months through Aug 2026
- 0
- Mcf gas, same 12 months
- 0
- bbl produced water, same 12 months
- 0
- bbl oil since Jul 2003 · 237,538 Mcf gas
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Reported production
Every month on file for this well on form C-115, summed across its pools and the operators that filed it. The newest months can still be amended.
12 months through Aug 2026 0 · prior 12 0
Hoover #002: Gas by month.
Completions
ONE PER POOL THE WELL IS COMPLETED IN
| Pool | Status | Perforations, ft | Completed | Produced | Oil, bbl | Gas, Mcf | Water, bbl |
|---|---|---|---|---|---|---|---|
| Harper Hill Fruitland Sand PC (Gas) | Plugged · Flowing | 1,224 to 1,234 | Jan 14, 2003 | Jul 2003 to May 2017 | 0 | 237,538 | 283,852 |
Operators of record
| Operator | From | To |
|---|---|---|
| Hilcorp Energy Company | Jul 12, 2018 | today |
| XTO Energy, Inc | Jan 1, 2008 | Jul 12, 2018 |
| Pogo Producing Company LLC | Dec 20, 2007 | Jan 1, 2008 |
| Pogo Producing Co | Sep 1, 2004 | Dec 20, 2007 |
| Calpine Natural Gas, L.P. | Nov 1, 2002 | Sep 1, 2004 |
Well record
- API number
- 30-045-31220
- Location
- A-21-30N-14W · 805 FNL, 935 FEL
- Coordinates
- 36.80466, -108.30875 ↗
- Ground elevation
- 5,662 ft
- Measured depth
- 1,380 ft
- True vertical depth
- 1,380 ft
- Perforations
- 1,224 to 1,234 ft
- Land
- Federal
- Property
- Hoover
- APD
- Approved Nov 1, 2002
- Proposed formation
- Harper Hill FT SND PC
- Target depth
- 1,415 ft
- Spudded
- Nov 19, 2002
- Plugged
- Feb 3, 2026
About this data
New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Production and injection filed before January 1993 are in lifetime totals as the Division's totals to that date, and in no month or year. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3004531220, documented in the API reference.