NEW MEXICO · WELLS · UNION COUNTY · API 30-059-20256 · SANTA FE DISTRICT

Bravo Dome Carbon Dioxide Gas Unit #221

PluggedVertical co2 wellOCD status: Plugged (site released)

County
Union

A vertical co2 well in Union County, New Mexico, operated by BP America Production Company. OCD status: plugged (site released).

Spudded December 3, 1984 and drilled to 2,589 ft measured depth; plugged July 13, 2000.

Completed in one pool: Bravo Dome Carbon Dioxide Gas 640.

0
bbl oil, 12 months through Aug 2026
0
Mcf gas, same 12 months
0
bbl produced water, same 12 months
0
bbl oil since first report · 0 Mcf gas

Completions

ONE PER POOL THE WELL IS COMPLETED IN

PoolStatusPerforations, ftCompletedProducedOil, bblGas, McfWater, bbl
Bravo Dome Carbon Dioxide Gas 640Plugged2,486 to 2,524——000

Operators of record

OperatorFromTo
BP America Production CompanyOct 3, 1984today

Well record

API number
30-059-20256
Location
G-22-22N-30E · 1980 FNL, 1650 FEL
Ground elevation
5,383 ft
Measured depth
2,589 ft
True vertical depth
2,589 ft
Perforations
2,486 to 2,524 ft
Land
State
Property
Bravo Dome Carbon Dioxide Gas Unit
APD
Approved Oct 3, 1984
Proposed formation
Tubb P&a 2000-07-13
Target depth
2,900 ft
Spudded
Dec 3, 1984
Plugged
Jul 13, 2000

About this data

New Mexico Oil Conservation Division (OCD), from its public database extracts. Status and type are in OCD's own words. Production and injection are what operators filed on form C-115, by well and month; twelve-month figures end in Aug 2026, the last month whose filings are in. Locations are from the well's location plat and are approximate. Nothing is estimated.

Developers: this page as JSON is GET /v1/data/wells/3005920256, documented in the API reference.