WELLS · 35-037-29196 · OKLAHOMA
R. P. Richards #31
ActiveVertical enhanced recovery injection well
- Operator
- Dexxon Inc
- County
- Creek
- Formation
- Simpson
A vertical enhanced recovery injection well in Creek County, Oklahoma, operated by Dexxon Inc. OCC status: active.
Spudded April 19, 2014 and drilled to 3,105 ft measured depth.
Completed in one formation: Simpson.
It has taken 179,190 bbl of injected water since January 2024, 119,860 bbl of it in the twelve months through December 2025.
Reported injection
179,190 bbl of water injected since Jan 2024. Reported through Dec 2025. The injection record here begins in 2011; injection before then is not shown.
Last 12 months 119,860 · prior 12 59,330(+102%)
R. P. Richards #31: Injected water by month.
Completions
ONE PER FORMATION THE WELL IS COMPLETED IN
| Formation | Status | Perforations, ft | Completed |
|---|---|---|---|
| Simpson | Active · Pumping | 2,823 to 2,901 | Apr 25, 2014 |
Well record
- API number
- 35-037-29196
- Location
- E2 NE SW SE-33-19N-07E · 887 FSL, 979 FWL
- Coordinates
- 36.07806, -96.57188 ↗
- Ground elevation
- 832 ft
- Measured depth
- 3,105 ft
- Perforations
- 2,823 to 2,901 ft
- Intent to drill
- Approved Apr 11, 2014
- Proposed formation
- Arbuckle, Bartlesville, Big Lime, Cleveland, Layton, Oswego, Red Fork, Simpson, Skinner
- Target depth
- 3,100 ft
- Spudded
- Apr 19, 2014
No oil or gas production is available for this well.
About this data
Oklahoma Corporation Commission (OCC), Oil and Gas Conservation Division. The well, its status, and its type are from the Commission's well file, in OCC's own words; the intent to drill, dates, depths, and formations are from the well's own filings. Injection is what the operator filed on form 1012A, by month; twelve-month figures end in Dec 2025, the last month whose filings are in. No oil or gas production is available for Oklahoma. Nothing is estimated.
Developers: this page as JSON is GET /v1/data/wells/3503729196, documented in the API reference.